The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Primary Phase (TY 5983)

MS 9016.43 · Events and incidents

The Primary Phase (TY 5983) is the calendrical designation for the interval beginning on the first day of the ninth month of Tower Year 5983 and closing, by administrative reckoning, on the forty-fourth day of the second month of Tower Year 5984. It is the only Primary Phase in the Phase Ledger whose entry is annotated in three hands, two of them disagreeing about the closing date, and the only one following which a new red ink was ordered. It should not be confused with the Primary Phase as a general term of administrative vocabulary, nor with the Primary Phase of The Great Dampness, which was centred on the Great Vertical Spiral and is recorded under its own designation.

For most of its duration the TY 5983 Primary Phase was unremarkable. Its notoriety is entirely retrospective, and attaches almost wholly to the Misfiling of Floor 41,102.

Commencement

Authorisation was granted by the Office of Phase Registry under instrument 5983/PR-11, signed by the Registrar of that year and countersigned, per standing arrangement, by a representative of the Bureau of Floor Designation whose name is given in the instrument as "the second clerk present". No clerk of that name appears on the Bureau's roster for TY 5983, and the Eleventh Concordance provides at Annex 9 that a countersignature by a person not on the roster is "of full effect notwithstanding". The Registry has never regarded the point as live.

The commencement was entered in the Phase Ledger in iron-gall ink on the first day of the ninth month, in a hand identified by the scriptorium as that of Aman Serevet, Registrar of Phases. Serevet's phase entries are conventionally precise; the TY 5983 entry omits the hour, which the Registry's own handbook requires, and the omission is the first of the article's several small irregularities.

Scope and conduct

The Phase's stated object was the reconciliation of floor designations in the western returns against the physical plates affixed to the floors themselves. Returns had been accumulating since the close of the Consolidation Phase at a rate of some eleven hundred a month, and the Office of Phase Registry took the view that a bounded interval would clear the arrears. It did not. The reconciliation reached floor 41,102 in the fourth month of the Phase and did not leave it.

Contemporary minutes record that Senior Reconciliator Hessa Vane twice requested an extension of the Phase's remit to cover the eastern returns, and twice was refused on the ground that the Fourth Concordance defines the Primary Phase as "that phase which is not secondary", which the Registry read as forbidding overlap. Vane's marginal note on the second refusal — "then the secondary returns may keep their secrets" — survives in the Registry's minute book and is the nearest the record comes to open dissent.

The Misfiling of Floor 41,102

The physical plate on floor 41,102 reads 41,102. The western return reads 41,120. The Phase's remit, as authorised, required the plate and the return to agree before the floor could be closed. Neither could be altered without the other; the Bureau of Floor Designation held the plate, and the return was sealed under the Seventh Concordance's rule against correcting the record during an open Phase. The floor was therefore boarded and listed as pending, a condition which was not discharged within the Phase, or indeed subsequently.

When the closing entry was struck through in red — the standard mark of closure under Phase Ledger practice — the phase was recorded as complete in every particular. The pending floors were not enumerated in the closing entry and no annexe to it survives. Whether the omission was an error of the Registry or of the scriptorium that fair-copied the entry is the substance of the article's chief scholarly disagreement.

Closure and the dispute

The Second Concordance at clause 7 requires a Primary Phase to be closed within the year of its commencement. The Eighth Concordance at clause 7 requires the same Phase to be closed within the year of its completion, which for TY 5983 fell four months into TY 5984. The Registry closed the Phase on the forty-fourth day of the second month, satisfying the Eighth and violating the Second; a separate school of reading, led by the Society for Concordantal Review, maintains that the Registry satisfied neither, on the ground that a Phase cannot be closed before it is complete and that the Second Concordance supplies the earlier and therefore governing date.

"Where two Concordances fix different days for one act, the Tower has not been told which day is meant, and the act is best done on the later."

— Eighth Concordance, Annex 2, annotation in a later hand

Aman Serevet, Registrar of Phases answered the Society's petition on the eleventh day of the third month in a ruling of four sentences, the last of which reads: "The Phase is closed; the floor is not; both statements are true and neither is a reproach." The ruling is much quoted and has settled nothing.

Consequences

Floor 41,102 remains boarded. The Office of Floor Registry continues to issue its plate number; the western return continues to record 41,120; and the discrepancy has become, in the phrase of the Bureau of Floor Designation, "a fixture of the fabric". Visitors are not to enter floor 41,102 by either number, and the injunction is posted at both.

The Office of Phase Registry thereafter required two countersignatures for any primary commencement, a measure known as the Serevet reform, which within three years had itself been amended twice. The Phase Ledger for TY 5983 carries the phase's commencement in iron-gall and its closure in red, and beneath both, in a third and unidentified hand, the words "and the floor". No office has claimed the annotation.

See also

Referenced by

Readers also asked

Primary Phase: how is it conducted?

The Primary Phase is the designation given, within the Tower's administrative vocabulary, to the first operative interval of any multi-phase undertaking, and is accordingly the most frequently invoked and least consisten…

Primary Phase
Great Vertical Spiral: where is it?

The Great Vertical Spiral is the primary circulatory artery of the Tower, a continuous helical transit corridor connecting all known floors. It is distinguished from auxiliary spirals and annexes by its central administr…

Great Vertical Spiral
The Great Dampness: what happened?

The Great Dampness, also formally classified as Moisture Anomaly Y5983-588 (Dual-Cycle), refers to the most significant and persistent water-related administrative crisis in recorded Tower history. A dual-incident phenom…

The Great Dampness
Phase Ledger: what does it set out?

The Phase Ledger is a continuous register, maintained by the Office of Phase Registry, in which every phase, sub-phase, and reinstatement occurring within the Tower is recorded in sequence. It is the oldest document in c…

Phase Ledger

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.