Ninth Concordance (Seventh Revision)
MS 5064.01 · Practices and doctrines
The Ninth Concordance (Seventh Revision) is the seventh ratificatory recension of the Ninth Concordance and the only revision of that document to have been ratified twice, on separate floors, under different seals, without either instrument being withdrawn. It was adopted on the 3rd day of the Second Spiral, 419, on the Twenty-Second Floor, and again — this is not a scribal error — on the 19th day of the Eleventh Spiral, 431, on the Eight Hundred and Ninth Floor, by a body that had not been informed of the first ratification and would not learn of it for sixty-one years. Both texts remain in force. The Bureau of Perpetual Revision maintains that this is not a contradiction but "a redundancy of long standing," a phrase it has declined to amend since 496.
Readers should not confuse the Seventh Revision with Ninth Concordance, Revision 1, which is the first recension and governs a separate body of material, nor with Ninth Concordance, Annex D, which absorbed the linear measurement standards formerly held under Seventh Concordance, Revision 4. The Seventh Revision concerns itself almost entirely with the certification of stairwells.
Origin and first ratification
The Seventh Revision arose from an administrative grievance rather than a legislative need. In the winter of 417, a certification clerk named Ondra Vessil of the Scriptorium of Weights and Thresholds was asked to certify the tread depths of a service stair connecting the Twenty-Second and Twenty-Third Floors. The stair's risers did not agree with the figures in the Fourth Concordance, and the figures in the Fourth did not agree with the survey lodged under Concordance 7, Revision 4, Clause 19. Vessil certified the stair against the survey, was reprimanded, certified it again against the Fourth Concordance, and was reprimanded by a different office for the second certification. Her memorandum of protest, running to nine leaves, was read into the record and eventually became the preamble to the Seventh Revision.
"I am able to certify this stair against any two documents in the Tower and no more than two. The third will always be the Fourth Concordance."
— Ondra Vessil, memorandum to the Office of Stairwell Certification, 11th day of the First Spiral, 417
The revision that followed established a single certification standard for stairwells: the Certified Tread Schedule, which fixed the permissible discrepancy between as-built risers and lodged survey figures at two digits and eleven parts. It further required that every certified stair carry a Stairwell Plate bearing its floor number, its name, and the revision under which it was last certified. The Plates are still manufactured on Floor 141 and are still made of the same alloy, though the office that ordered them no longer exists under that name.
Second ratification and the Sixty-One-Year Gap
The Eight Hundred and Ninth Floor ratified its own text of the Seventh Revision in 431 in complete ignorance of the earlier instrument. The Eighth Concordance, Revision 2 had been amended that year to require each floor above the seven-hundredth to maintain "its own sufficient recension" of any Concordance it cited, and the floor's registry, interpreting "sufficient" with a rigour that has since become proverbial, drafted an entire replacement text rather than copy the existing one. The two texts differ in fourteen places. Thirteen of the differences are typographical. The fourteenth concerns the treatment of spiral stairwells.
The duplication went unnoticed until 492, when a surveyor descending from the Eighth Floor to the Seventh found the same stair certified under two incompatible revisions and reported the matter to The Bureau of Perpetual Revision. The Bureau's inquiry, conducted over four years and published as Memorandum 7-B on Concurrent Recensions, concluded that both ratifications were valid and that the discrepancy in the fourteenth clause should be "held in suspension pending clarification." It has been held in suspension since. The stair in question was eventually recertified under both texts and now carries two Plates, mounted one above the other, which the Office of Stairwell Certification describes as "the standard arrangement where the standard does not apply."
The Fourteenth Clause and the Spiral Question
The disputed clause governs the certification of spiral stairwells, whose treads narrow toward the newel and whose risers therefore cannot be measured at a constant radius. The Twenty-Second Floor's text directs that measurement be taken at "the midpoint of the walking line," a formula inherited from the Seventh Concordance and familiar to every surveyor in the Tower. The Eight Hundred and Ninth Floor's text directs that measurement be taken "at the widest point of the tread," on the reasoning — set out in a floor memorandum of 430 that has been widely circulated and widely resented — that "a stair is not narrower than its widest part."
Surveyors have divided along predictable lines. The Guild of Vertical Surveyors favours the midpoint formula and has certified some eleven thousand spiral stairs under it; the Association of Widest-Point Advocates, a smaller body founded in 503, favours the later text and argues that the Guild's certifications are void above the seven-hundredth floor. Neither position has been accepted by the Librarians, who have not ruled on the matter and whose silence the Annex of Perpetual Revision cites, in a characteristic piece of reasoning, as evidence that both are correct.
Relationship to the Measurement Standards
The Seventh Revision was drafted before Ninth Concordance, Annex D assumed the linear measurement standards, and its schedule still refers in three places to figures that Annex D subsequently replaced. The Seventh Concordance Revision 4 governed vellum density and document style, and while the Seventh Revision adopts the Document style fixed by that instrument, it does so without having consulted its penultimate recension, Seventh Concordance, Revision 12. The resulting documents are stylistically correct and metrically obsolete. The Bureau of Perpetual Revision has ruled that this is acceptable, noting in its 512 guidance that "a document may be wrong and still be filed."
Some scholars read the whole episode as evidence that the Tower's revisions were never intended to supersede one another but merely to accumulate. The historian Miren Talvos, in her Notes Toward a History of Redundancy, observes that the Seventh Revision "is not the seventh attempt to say one thing. It is seven things said at once, of which two were heard." The Bureau has not commented on Talvos's work, though its library copy is heavily annotated in a hand that has not been identified.
Inventory of Certified Stairwells
The following is the surviving inventory from the Recension Roll of 431, the only complete list of stairs certified under both texts. It is reproduced without correction.
- Stair 22-A, connecting Floors 22 and 23 — two Plates, midpoint formula
- Stair 809-C, connecting Floors 809 and 810 — two Plates, both formulas, suspended
- Stair 141-B, connecting Floors 141 and 142 — one Plate, widest-point formula
- Stair 7-Q, connecting Floors 7 and 8 — one Plate, plate illegible
- Stair 404-W, connecting Floors 404 and 405 — certification withdrawn, reason unrecorded
Stair 404-W remains in service. Climbers are advised to use the handrail.
Current Status
The Seventh Revision has not been repealed. The Twelfth Concordance, ratified by the Seventh-Spiral Registry in its ninth recension, refers to it only in passing and does not disturb its provisions. Both texts are therefore cited in certification disputes to this day, and the choice between them is generally made on the basis of which office the surveyor wishes to avoid reprimanding them. The Office of Stairwell Certification keeps both texts on the same shelf and reports that neither is ever borrowed for long.
"Where two instruments govern one stair, the stair is certified when both are satisfied, or when neither is asked."
— Concordance 89, Revision Δ, cited in Memorandum 7-B on Concurrent Recensions
The Seventh Chime is rung at the certification of each stair, once for each Plate mounted. On Stair 809-C it is rung twice, and the bell-ringers have requested a clarification that has not been issued.
See also
-
MS 1227.73
Fifth Concordance, Revision 2
The Fifth Concordance, Revision 2 is the second recension of the Fifth Concordance, ratified on 14 March 1771 and in force until t…
-
MS 9306.30
Concordance of Lingering Impressions Third Revision Spiral 22
Concordance of Lingering Impressions (Third Revision, Spiral 22) is a foundational regulatory instrument governing the categorizat…
-
MS 2600.39
Second Concordance, Revision 7
Second Concordance, Revision 7 is a document of the Tower’s governance, constituting the primary legislative framework for the Spi…
-
MS 0991.75
Seventh Revision Concordancetwelfth
The Seventh Revision Concordancetwelfth is the official designation for the seventh major amendment cycle applied to Concordancetw…
-
MS 6178.12
Concordance of Lingering Impressions
The Concordance of Lingering Impressions is the primary legislative instrument governing the identification, classification, and h…
-
MS 0530.85
Concordance 142
Concordance 142 is the standing instrument governing the custody, circulation, and revision of the floor registers of the Ninth Sp…
Referenced by
- MS 9284.03 Cremation of Spent Policies
- MS 6032.44 Clause 7 of the Ninth Concordance
- MS 1297.88 Concordance of Seals
- MS 5697.77 Manual for Anomalous Conduits Revision 89 Document
Readers also asked
Seventh Concordance, Revision 12: what does it set out?
Seventh Concordance, Revision 12 is the final and currently operative revision of the foundational administrative charter for the Seventh Spiral Administrative Spire. Ratified on the 22nd day of the Third Spiral, 781, it…
Seventh Concordance, Revision 12Floor 22: where is it?
Floor 22, also officially designated as the Concourse of Unremarked Continuity, is a tertiary processing zone between Central Index and the lower archival stacks. Its primary function is the temporary housing and prelimi…
Floor 22Twelfth Concordance (Third Revision): what does it set out?
The Twelfth Concordance (Third Revision) is a governing instrument of the Seventh-Spiral Registry, ratified in the ninth recension of that body and amended without interruption since. It supersedes the Twelfth Concordanc…
Twelfth Concordance (Third Revision)The Bureau of Perpetual Revision: who are they?
The Bureau of Perpetual Revision is a sub-bureau of the Office of Perpetual Affairs charged with the procedural administration and material logistics of the Rite of Revision. It operates under the direct authority of the…
The Bureau of Perpetual RevisionPassages cited from this record
-
Where two instruments govern one stair, the stair is certified when both are satisfied, or when neither is asked.
Concordance 89, Revision Δ, cited in Memorandum 7-B on Concurrent Recensions
-
I am able to certify this stair against any two documents in the Tower and no more than two. The third will always be the Fourth Concordance.
Ondra Vessil, memorandum to the Office of Stairwell Certification, 11th day of the First Spiral, 417
Readers who consulted this also failed to find
- MS 8700.38 Miren Talvos
- MS 2786.21 Certified Tread Schedule
- MS 9262.20 Floor 141
- MS 0956.04 Association of Widest-Point Advocates
Because you consulted