The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Floor 730

MS 4879.76 · Places and structures

Floor 730 is a held floor, maintained in a state of administrative suspension, situated between Floor 728 and Floor 731. It is the only floor in the Tower whose name is under formal dispute: the nameplate at the landing reads Floor 730, but no Librarian since the floor's reclassification has been permitted to confirm aloud what the floor is for, and the stipend that would pay for an inventory has been withheld for two hundred and eleven years.

Floor 730 is reached by the north stair only. The south stair opens onto a landing that has been sealed since the winter of Floor 728's great correction, and the Concordance of Sealed Landings forbids the breaking of that seal on the grounds that it is not yet known what the sealed landing opens onto.

Suspension and the Withholding

The suspension dates from the Seventh Concordance, Annex 12, which provides that no floor may be inventoried until the floor beneath it has been inventoried and its inventory countersigned. The difficulty is that Floor 728 is itself held in suspension by Floor 727, which is held by Floor 726, and so on without a settled floor — a chain that the Bureau of Descending Order records as the long silence.

The practical consequence is that the steward's pay for Floor 730 rests in an escrow account at the Office of Held Stipends and has not been drawn upon. The current steward, Steward A. Ostley, has filed one hundred and forty-two annual claims and received one hundred and forty-two receipts. The receipts are bound separately, and the binding is the only part of the floor's business that has been completed.

Nameplate and Breach

In 2,114 the incumbent steward, Ostley the Elder, replaced the floor's nameplate with a brass plate reading Floor 730 — a choice the Annex 12 hearing later described as "a description of the premises rather than a statement of its contents." The Wardens of the Landing had that plate melted within the year, and the fine fell against Ostley's personal stipend, which could not be paid. Ostley recorded the matter in the lease's margin: "The plate is bought, and the plate is melted, and the stair is still the stair."

The only ground the Tower has found that the floor is, in fact, a floor rather than a corridor of the stair is the persistence of its nameplate. A nameplate that is melted has been read as a nameplate, and therefore the reading has been treated as evidence of the floor, which is the basis of what the Warden of the Landing calls the "nameplate defence" and everyone else calls the "melted recovery."

The East Liquidators and the Naming Dispute

Two offices have disputed the floor's official designation for eight years. The East Liquidators maintain that the floor should be classified as a reversed void — an entrant crossing the landing must be counted as leaving, and the ledger removes the crossing from its roll. The North Liquidators maintain that the floor is simply "unlocated" and that the roll is not to be touched, on the ground that removing a crossing is a change to the roll, and changes to the roll are made under the Adjudication of Moves, whose seal is in the possession of the East Liquidators.

The dispute was settled in the winter of Year 890 by a ruling that neither side would have accepted had it been read: an entry and a departure are the same crossing, and the page must be turned to make the same crossing twice. Both offices have since reported that turning the page is the whole of the work, and neither office has been audited, because the auditor's desk is on Floor 730 and has not been staffed since the withholding.

Layout

The floor is a standard-height chamber of the Floor 118 class, with the stair's curve running through the east wall and the nameplate at the head of the stair. The floor plan is simple: on the south side, a registration desk; on the north side, the auditor's desk; and at the western end, the filing ranges of the Registry of Lands and Rents, which have been sealed in wax and are not to be read. The floor's range is open without appointment, and a book may be read in place but may not be left open on a surface over the ranges.

The Registry of Lands and Rents does not appear in any index of the Tower's departments, and the wax is chipped, so the register's contents are readable. It is only the seals that are not.

Access

The stair between Floor 728 and Floor 730 is open, and a visitor may carry the floor's correspondence without a permit, but no surface may be carried with a name on it, and no instrument may be carried except the file, which is checked at the stair. The floor is not on the regular inspection round, and the Wardens of the Landing have not visited since 2,110; the south landing, it is noted, is closed until the east stair is declared passable, which is not a matter for the Wardens.

See also

See also

Referenced by

Readers also asked

Seventh Concordance: what does it set out?

The Seventh Concordance is the primary administrative codex governing the measurement, classification, and cataloguing of phenomena defined by their absence, incompletion, or intrinsic paradox. Ratified in Year 47 of the…

Seventh Concordance
Floor 118: where is it?

Floor 118 is a standard-height floor occupying the interval between Floor 113 and Floor 147, and is chiefly remembered as the site of the Tally of Unclaimed Names and for the long dispute between the Office of Vertical R…

Floor 118

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.