The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Floor 2002

MS 2648.15 · Places and structures

Floor 2002 is a documented terminus floor, situated between Floor 1999 and Floor 2004. It is the highest floor on which the stair-head has been surveyed to a closed door by continuous chain, and the lower of the two terminal landings recognized by the Survey of the Upper Landing; the other, at Floor 11004, is discussed separately. Floor 2002 is administered jointly by the Office of Terminal Verification and the Bureau of Unfinished Stairs, an arrangement that has produced more Concordance amendments per shelf-metre than any other floor of comparable size.

Description

The floor presents as a single windowless chamber of standard height, 14.2 metres by 9.0 metres, floored in grey slate and walled to the ceiling in sealed document cases. None of the cases has been opened on the record since Floor 1888 was resurveyed in the winter of the third recension; the seals are intact and the keys, by the Keys Ledger, are held at Floor 113 and have not been requested.

The far wall bears the door that gives the floor its standing. It is oak, single-leaf, and fitted with a brass plate reading PROVISIONAL — DO NOT PASS, struck in the Scriptorium of Provisional Plates and identical in lettering to the plate catalogued on Floor 773. The door's lower edge sits 4 mm above the slate. The gap is wider than the surveyors' feeler gauge of 2 mm, and this single measurement is the entire substance of the dispute described below.

The Historical Entry

Floor 2002 was entered three times. The first entry, by surveyors of the Second Recension, returned an inventory of two hundred and nine items and the note, entered without emphasis, that "the catalogue ends here." The second, in the Year of the Long Stair, recorded the plate, the gap, and nothing further. The third, which the Office of Terminal Verification still calls the Historical Entry, is the one that closed the question on paper.

"Having walked the stair from Floor 113 to the door of Floor 2002 without intervening landing, we find the stair to be continuous and the floor to be a terminus. No passage beyond is recorded, and none is sought. The seal of this office is affixed without prejudice to the question of what lies above."

— Office of Terminal Verification, Register of Termini, entry 11

The entry was countersigned by the Bureau of Unfinished Stairs with a marginal note, still legible, reading "noted, and not conceded." The Bureau has maintained that note in every subsequent amendment.

Dispute over the door

The disagreement is old and has outlasted the offices that raised it. The Office of Terminal Verification holds that a floor is a terminus where the stair stops; the stair stops at Floor 2002; the gap beneath the door is a maintenance tolerance and not a passage. The Bureau of Unfinished Stairs holds the reverse: that anything through which a ratified measurement can be taken is not a terminus but an aperture, and cites Floor 1117 — where a reversal of the stair was certified on the strength of a 6 mm observation — as precedent.

Two Concordances speak to the matter and do not agree. Concordance 61, Annex 2, states plainly that "a gap of less than one centimetre is neither here nor there, and shall not be surveyed." Concordance 88, Annex 7, states with equal plainness that "every aperture, however fine, is a door, and every door a floor, and every floor a holding." Appeals to the Standing Order on Contradiction have been made eleven times. The Standing Order resolves contradictions in favour of the earlier Concordance, except where the later is held to bear on termini, in which case it resolves in favour of the later, and the question of which clause applies has itself been the subject of nine further appeals.

The Clerk of the Gap, an office created to settle the matter and never abolished, recorded in his first report that "the two positions are indistinguishable in their consequences and irreconcilable in their language," and requested a transfer. The request was granted. His successor has filed no reports.

Survey and access

Chain measurement to Floor 2002 is performed annually in the second month by two surveyors travelling in opposite directions from Floor 1999, who must agree to within 3 mm before the reading is entered. The reading has not varied since the third recension. The stair between Floor 2004 and Floor 2002 is surveyed but not certified, and appears on the charts as a broken line.

Access is by appointment through the Bureau of Unfinished Stairs. Visitors are asked to remove their boots at Floor 1999 and to carry them, as the slate of Floor 2002 is protected.

Status

Floor 2002 remains listed as a provisional terminus. The Office of Terminal Verification prints it in its register with a dagger, the Bureau prints it with an asterisk, and the two marks are defined in their respective prefaces as meaning the same thing. Whether the floor is the top of anything is considered a category error and is not discussed. The small brass plate on the door is polished each year before the survey and is the only object on the floor that is.

See also

Referenced by

Readers also asked

Floor 773: where is it?

Floor 773 is a provisional floor lying between Floor 772 and Floor 774, and is the only floor in the Tower whose name has been struck from the register without the floor itself being struck from the stairwell. It is clas…

Floor 773
Floor 1888: where is it?

Floor 1888 is a commemorative floor situated between Floor 173 and Floor 1902, and is the only floor in the Tower whose entire catalogue is devoted to the anniversary of a single event. It is entered by the east stair fr…

Floor 1888
Second Recension: what does it set out?

Second Recension is the collective designation for the body of corrected, expanded, and in places reversed text produced during the general revision of the Floor Register in the years 1141–1149. It is the earliest recens…

Second Recension
Floor 1117: where is it?

Floor 1117 is a designated reversal floor located between Floor 909 and Floor 4,200. It functions as the primary administrative hub for the storage and processing of incomplete hermeneutic loops, a class of non-manifest …

Floor 1117

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.