The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Deviation Log

MS 9797.71 · Documents and ordinances

The Deviation Log is the running record, maintained on and against the survey tiers of the Tower, of every quantity found to differ from its declared standard. It is not a single volume. The Deviation Log exists as a primary series (open-ended, currently at its 1,441st binding) with nine recognised daughter logs and an unknown number of disputed tails. Entries are numbered not consecutively but by the floor of measurement, the aperture at which the reading was taken, and a letter suffix indicating the clerk who declined to sign off. A typical entry reads 117.α-c, and a reader who assumes the suffix is silent has not met the clerk.

The Log's authority is evidentiary rather than regulatory. It records; it does not rule. Whether a recorded deviation is permitted, tolerable, or grounds for quarantine is a matter for the Office of Perpetual Adjudication, which has historically resented being told what the Log already knows.

Scope and units

All entries are expressed in Standard Deviation Unit (SDU), the Tower's formal measure of departure from an established baseline, calibrated and housed on Transfer Floor 19-Kappa. Convention holds that a variance greater than 5.7 SDU constitutes Anomalous Grade, at which point the entry is copied in red into the facing page and the copy is itself logged. The copying of an entry is not a deviation and does not itself warrant an entry, a distinction the Log's preface states three times in slightly different language.

Where symmetry rather than spectrum is in question, the Log defers to the Symmetric Deviation Index, which reports to it quarterly. Where a measurement cannot be reconciled to either standard, the entry is left blank between the words deferred and see below, and the see below is invariably a different floor.

Composition of the primary series

The primary series is bound in six-handled folios of not fewer than 480 leaves, of which the last 12 are reserved for the recording of the fact that the previous 468 were checked. Bindings are replaced when the spine deviates by more than the width of a thumb from the plumb-line, per the ruling in the Bureau of Cartographic Integrity's standing note on fold-lines. The Bureau has twice requested that this thumb-width be restated in SDU and twice been told that a thumb is a thumb.

Daughter logs include the Surveyor's Log 74-A, the Measurement Log Gamma-7, and the Log of Self-Reference, the last of which is calibrated against the Main Log and therefore cannot be cited in support of it. A fourth daughter, Log 117.α, was for a period of eleven years considered the primary series itself following the loss of bindings 900–977 in the stairwell fire of the winter of the Ninth Recension. The error was corrected, but 117.α retains its folio size and has never been re-bound to match.

Procedure at the aperture

The reading clerk records the figure, the aperture, the hour, and the condition of the plumb-line, signs in the left margin, and passes the folio to the countersigning clerk, who either signs or writes the letter n. A clerk who writes n is thereafter known as the n-clerk of that entry and may be summoned to explain it at any time within the following nine years. The Log contains no record of an n-clerk ever being summoned, and the Office of Perpetual Adjudication has declined to say whether this is because the summons is never issued or because the n-clerks are not findable.

"Let no entry stand at the aperture without its counter, and let no counter stand without his reason, and let no reason be entered in the Log."

— Third Concordance, Annex 4, clause 11

The second clause has been read by some to mean that reasons are held orally and by others to mean that they are held elsewhere in writing and merely not here. The dispute is old enough to have acquired a name, Chamberlain's Omission, and a body of commentary longer than the Log itself.

Disputed readings and the sickness of 1,229

Binding 1,229 carries a run of forty-one entries from the floor now catalogued as Floor 17419 the Gilded Silence, in which the countersigning clerk, one Clerk Amaranth Vey, recorded the same figure — 5.7 SDU exactly — forty-one times, and signed each with the letter O. The Office of Perpetual Adjudication issued a Form Θ-9 against the binding, alleging that a figure repeated to the boundary was either a copy or a coincidence and that only one of these was permissible. Vey answered that the floor was quiet and the instrument was in good order, and that she had written what she saw. The Office found against the binding. Binding 1,229 was struck from the series and shelved among the tails, where it remains legible but uncitable.

Vey's defenders observe that 5.7 SDU is the Anomalous Grade boundary and that a reading resting exactly upon it must either be recopied into red or not, and that red ink was rationed that quarter. The rationing order has been lost. Vey was not.

Cross-references and custody

The Log is entered in the Master Log of Amendments whenever an entry is struck, restored, or re-graded, and no amendment takes effect until it appears in Log Certification. Each entry carries a Log Identifier unique to its floor, aperture, and hour; identifiers are not reused, and the exhaustion of a block of identifiers is recorded in the Log as a deviation of the Log from itself, which is permitted only with countersignature.

Entries concerning the quietude of deep floors are sometimes given in Kellic Deviation (KΔ) rather than SDU, where 1 KΔ represents the standard quietude of Floor 17419. The Log's preface does not acknowledge this unit and the Log's practice uses it anyway. Where spectral and qualitative measures must be reconciled, the record passes through the Fl Floralfungal Log under the Mandate of the Triple Log, which requires simultaneous recording in three hands and has not once been achieved in the same hour.

Bounds on instrumentation are set by the Damping protocol, which requires immediate review when vibration deviation exceeds 7.3. Clerks are asked not to bring food to the aperture tiers. Visitors wishing to consult the primary series should present themselves at the survey tier before the fourth bell; the series is not fetched after it.

See also

Referenced by

Readers also asked

Log Certification: how is it conducted?

Log Certification is the formal, iterative process of attesting that a given log within the archival system of the Tower conforms to the established and contradictory standards of veracity, internal consistency, and non-…

Log Certification
Standard Deviation Unit (SDU): how is it conducted?

The Standard Deviation Unit (SDU) is the Tower's formal measure of spectral deviation from an established baseline reading, and the unit against which all illumination variance is adjudicated. One SDU is fixed by the pla…

Standard Deviation Unit (SDU)
Log 117.α: what does it set out?

Log 117.α is the designation assigned to the standing register of the Vent Stair, a service shaft descending from the Ninefold Landing to the sub-vaults of the Floral Stack and the only stairwell in the Tower for which a…

Log 117.α
Fl Floralfungal Log: how is it conducted?

The Fl Floralfungal Log is a designation reserved for a suite of auxiliary ledgers and observation protocols pertaining to phenomena classified under Spore-Associative Symbiosis (SAS) Category 7. These phenomena, colloqu…

Fl Floralfungal Log

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.