Bureau of Planned Expansions
MS 2097.52 · Guilds, orders and offices
The Bureau of Planned Expansions is the office of the Tower responsible for drawing up, in advance and in writing, the schedules by which floors, wings, stairwells, and apertures not yet built shall be enlarged upon their eventual construction. It is the mirror-office of the Bureau of Planned Obsolescence, and the two are frequently confused by visiting scholars, a confusion the Bureau has stopped correcting. The Bureau occupies the eastern third of Floor 1,108, a warren of survey rooms whose windows look onto an interior light-well that has been scheduled for expansion since 1194 and has not been built.
The Bureau's governing instruments are the Forward Prospectus, a register of structures to be enlarged at a future date and the floor area each is expected to gain, and the Annex of Anticipated Openings, which records doorways that will be cut once the walls they penetrate have been raised. Neither document has ever been amended in the direction of shrinkage. The Bureau regards this as a matter of institutional discipline rather than policy: "A plan of expansion, once sealed, does not contract; the structure may, but the paper may not," per Concordance 22, clause 6.
Origin and separation from the Scribes
The Bureau was carved out of the Scribes of Obsolescence in the same instrument that created its mirror, by Concordance 41, which transferred to the Bureau of Planned Obsolescence all forward-dated declarations of lapse and, in the following clause, vested in a newly constituted Bureau of Planned Expansions all forward-dated declarations of growth. The splitting of a single office into two along a temporal axis has been criticized as artificial. The Bureau's position, recorded in a marginal note by the founding clerk Ilse of the Second Landing, is that "obsolescence and expansion differ not in kind but in sign, and an office cannot hold two signs at once without dropping one."
Ilse's grievance is preserved in the Bureau's front matter. She had petitioned for eleven years to be transferred to the new Bureau's survey rooms, on the grounds that she had drafted the clause creating them and wished to see it administered. The Librarians denied the petition under Concordance 41, Annex 2, which bars any clerk from administering an instrument they themselves penned. Ilse remained with the Bureau of Planned Obsolescence until her death in the winter of 1208 and is said to have refused, on principle, to sign anything that was not already out of date.
Relationship to the Bureau of Ontological Placement
Proposed expansions of the Bureau's own remit are subject to a Territorial Impact Assessment, conducted in this instance by the Bureau of Ontological Placement rather than by the Bureau of Cartographic Integrity, which ordinarily performs such assessments but recuses itself where the expansion concerns the drawing of maps rather than the territory they depict. The recusal has been in force since the Bureau of Cartographic Integrity's assessment of 1211, in which the Bureau found that a planned expansion of the eastern survey rooms would "require the expansion of the map of the eastern survey rooms, which would require the expansion of the map," and returned the file unopened.
The Bureau of Linear Interpretation conducts a Coherence Audit of each proposed mandate expansion before it reaches the Committee. Its audits of this Bureau have returned the same finding in every year since 1213, namely that the Bureau's plans are coherent but premature, and that this is the intended condition of a plan. The finding is filed and ignored.
The light-well question
The disputed light-well on Floor 1,108 has generated more correspondence than any other feature of the Bureau's rooms. A Notice of Structural Enlargement, sealed in 1194, commits the Bureau to widen the well by nine feet upon a date to be fixed by the Forward Ledger. The Committee for Ontological Review has twice disputed the methodology by which the date is to be fixed, arguing that a structural enlargement cannot be scheduled against a document whose own terms have not yet been settled, and that the Bureau is in the position of waiting for a date it is itself responsible for writing. The Bureau's reply, drafted by the surveyor Aurel Vann in 1216, concedes the circularity and asserts that all forward planning is circular, the question being only the diameter of the circle.
"Let the well be widened when the Ledger says so, and let the Ledger say so when the well is widened. This is not a defect. It is a schedule."
— Aurel Vann, Reply to the Committee for Ontological Review, 1216
No widening has occurred. The Bureau notes, in its annual return, that the light-well remains at its historic dimension and that the nine feet are held in reserve.
The Reserve of Unbuilt Measure
Because the Bureau's plans assign floor area that does not yet exist, it maintains a standing account of unbuilt measure, held in trust against the eventual construction of the structures it has forecast. The account is audited each tenth year by the Bureau of Static Inventory, which counts the unbuilt measure and reports a total. The total has risen in every audit since 1194 and now stands at 41,600 square feet, slightly more than the area of the floor on which it is held. The Bureau of Dimensional Reconciliation has been asked to reconcile the excess and has replied that the account is not an excess but a forecast, and that reconciling a forecast with a measurement is the definition of disappointment. It has not been asked again.
The Bureau's small standing regulations are listed below, as extracted in the survey rooms' front matter:
- Surveyors shall not pace out a distance that has not yet been built, except to establish that it has not.
- No plan shall be sealed on the same day as the plan it supersedes.
- Visitors shall remove their boots at the threshold of the eastern survey rooms; the floors are planned and may not be walked on in their planned condition.
- All dates in the Forward Prospectus shall be written in full, never abbreviated, as the prospectus has been consulted for abbreviation alone.
Contemporary standing
The Bureau currently employs fourteen surveyors and one clerk of seals, and has four hundred and six expansions on its books, none of them built. It is the only office in the Tower whose productivity is measured by the difference between what it has planned and what exists, a figure it reports annually and which has never been questioned. Its principal antagonist, the Bureau of Planned Obsolescence, has twice proposed that the two offices be merged along the axis of their difference, and twice the Tenth Concordance has precluded the proposal as a theoretical expansion of the Tower. The Bureau has adopted no official view on the preclusion. Its surveyors, asked informally, observe that a plan to merge two offices that plan the future would itself require planning, and that they would be glad to undertake it.
See also
-
MS 5743.25
The Apertures
The Apertures are the designated openings within the Tower's substructure that provide access to or define the boundary of a chamb…
-
MS 6638.76
Concordance of Stairwells
The Concordance of Stairwells is the collective instrument by which the Tower's interior ascent and descent are ordered, consolida…
-
MS 0633.50
Substantive Expansions
Substantive Expansions are structural or archival additions to the Tower that have been formally declared to possess substance, an…
-
MS 1874.29
Dimensional Calibration
The Dimensional Calibration is the formal regulatory and procedural discipline concerned with the measurement, verification, and a…
-
MS 7399.51
Architects' Guild
The Architects’ Guild is the legally recognized body for the design, certification, and maintenance of all structural transitions …
-
MS 6903.55
Stairwell Paradox
Stairwell Paradox refers to any logical inconsistency, ontological contradiction, or recursive anomaly whose primary vector or loc…
Referenced by
- MS 1875.48 Architectural Cartographers' Guild
- MS 0633.50 Substantive Expansions
Readers also asked
Bureau of Cartographic Integrity: who are they?
The Bureau of Cartographic Integrity (BCI) is an administrative division of The Librarians established under the provisions of Clause IV of the Tenth Concordance. It serves as the ultimate arbiter of spatial truth for al…
Bureau of Cartographic IntegrityBureau of Linear Interpretation: who are they?
Bureau of Linear Interpretation is the regulatory body vested with the authoritative, final determination of line ends within the Tower's administrative lexicon. Established under Provision 17(a) of the Seventh Concordan…
Bureau of Linear InterpretationBureau of Static Inventory: who are they?
Bureau of Static Inventory is the administrative body responsible for the compilation, verification, and oversight of the official Static Manifests. Formally established by Clause 14 of the Nineteenth Concordance, the Bu…
Bureau of Static InventoryConcordance 22: what does it set out?
Concordance 22 is a legislative instrument governing the protocols for the creation and classification of textual paradoxes within archival holdings. Promulgated on 15 Floris, 732 (Tower Standard Chronology), its primary…
Concordance 22Passages cited from this record
-
Let the well be widened when the Ledger says so, and let the Ledger say so when the well is widened. This is not a defect. It is a schedule.
Aurel Vann, Reply to the Committee for Ontological Review, 1216
Readers who consulted this also failed to find
- MS 4197.88 Ilse of the Second Landing
- MS 0911.21 Forward Ledger
- MS 5894.63 Aurel Vann
Because you consulted