The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Barrier Erection

MS 0762.16 · Practices and doctrines

Barrier Erection is the sanctioned procedure by which any material, procedural, or ceremonial device is installed to arrest the movement of something that has not yet been decided upon. The term is defined in Third Concordance, Annex 2, and administered — though not, as several rulings have established, owned — by the Sub-Department of Barriers, a body whose records occupy four floors of the eastern shaft. Erection is distinguished from manufacture, which is unregulated, and from removal, which is forbidden under a standing instruction whose number is disputed.

No Barrier may be erected without a stated purpose, a stated duration, and a stated officer to whom its failure will be attributed. Instruments that meet only two of the three requirements are known as partial installations and are left standing, on the reasoning that removing them would itself constitute an erection.

Scope and instruments

Erection authority derives from Instrument of Sub-Departmental Erection 44, which the Sub-Department cites more often than any other document and has never read in full at a single sitting. The Instrument's remit is broad: where its clause 2 describes subjects that are both documented into being and independently mobile as "the Bureau's whole concern, and the reason it is never quiet," later clauses set out the conditions under which such subjects may be walled, taped, veiled, or merely watched.

The standard instruments are four. Non-Parallel Barrier Tape is applied wherever lines of incidence have drifted from true. Tripartite Barriers are reserved for leakage readings exceeding 2.0Λ, and for holdings with a Narrative Inertia rating below 2.0 K.U., which must be isolated to prevent narrative leakage. Threshold Dampening Fields accompany any erection within forty cubits of a stairhead. Sanctioned Yellow Tape is used at the Ceremonial Barrier Gate and nowhere else; its application there supersedes Non-Parallel Barrier Tape entirely, a precedence established in Fourth Concordance, Clause 19, and resented by the tape office to this day.

The Erection Log and the question of the first Barrier

Every erection is entered in the Erection Log of the floor on which it occurs, in a hand other than the erecter's. The Log of Floor 318 is the archive's oldest continuous record and opens, on its first leaf, with an entry that describes the erection of the Log itself. No earlier entry has been found. The Sub-Department treats this as evidence that no Barrier precedes its own record, while the Indexers Guild maintains that the leaf is a later insertion, and has said so in writing at least nine times.

The dispute sharpened in the winter of the year the eastern shaft flooded, when Clerk-Adjunct Marrow Vesque refused to countersign an entry on the grounds that the Log describing the Log was "an erection of an instrument and an instrument of an erection at once, and therefore a recursion the Sub-Department has no clause for" (Vesque, Memorandum on the 318 Leaf, unnumbered). Vesque was not disciplined. The entry remains unsigned, and the Sub-Department has since required that the fourth clause of any erection return be read aloud before the third.

"A Barrier erected in the absence of a dispute shall be deemed provisional; a Barrier erected in anticipation of a dispute shall be deemed permanent; and a Barrier erected during a dispute shall not be discussed until the dispute is closed."

— Fourth Concordance, Clause 7

Tripartite practice and the division of roles

Tripartite Barrier Practice redefines a Barrier as something applied to information rather than matter, and is codified in Annex C, which divides each floor manifestation report into three non-communicating roles so that no single recorder can bias the account. Erection under Annex C is therefore an act of reporting, and the physical Barrier is described in the annex as "the least of the three, and the one that will be blamed."

In practice the roles communicate constantly. The most detailed surviving account of a Tripartite erection — carried out on Floor 604 over four days to contain a leakage reading of 2.6Λ — notes that the three recorders shared a corridor, a kettle, and, by the third day, a version of events. Their reports agree on nothing except the Barrier, which all three describe as being where it was not.

Ceremonial erection at the Oscillating Stairwell

Ceremonial erections proceed under a different warrant, and the Ceremonial Barrier Gate is classified as an Intent Gate, which is to say it keeps dossiers. The Gate at the seventh step of the Oscillating Stairwell was installed to prevent further descent during Phase Gamma and has not been moved since, though Phase Gamma is generally held to have ended. Its dossiers are current. The Gate at the Approach of Long Recitation was an instance of a frame being completed but never inscribed, and is cited in the Sub-Department's handbook as the reason no ceremonial erection may be left at the second stage beyond a single night.

Visitors are asked not to knock on an Intent Gate. The practice was prohibited after an incident on Floor 891 in which a gate answered.

Rulings and disagreements

The principal scholarly disagreement concerns whether erection is a category of Barrier practice or a separate competence. Fifth Concordance, Annex 1, holds that a Barrier exists independently of the act of erecting it and may therefore be cited before it is built; Sixth Concordance, Clause 3, holds that nothing is a Barrier until it is standing, and that documents describing unbuilt Barriers are "speculative instruments." Both annexes are bound in the same volume. Neither has been amended.

A secondary dispute concerns Permeative Phenomena, which pass through erected Barriers without registering on any Log, and which the Sub-Department does not classify as leakage on the grounds that leakage requires a vessel. The Guild has twice petitioned to have this position reviewed. The petitions were referred to a committee, which erected a Barrier, and adjourned.

The Resonance Veil, the Memory Casket, the Taxonomic Isolation Seal, and the Chromatic Filters are all, at the time of writing, standing. Their erection dates are recorded. Their purposes are recorded separately, on a floor that is currently closed for indexing.

See also

Referenced by

Readers also asked

Sanctioned Yellow Tape: what is it for?

Sanctioned Yellow Tape is a category of adhesive barrier tape authorized under the Third Concordance for the demarcation and temporary sealing of interstitial anomalies, moisture leaks, and other environmental inconsiste…

Sanctioned Yellow Tape
Barrier: how is it conducted?
Threshold Dampening Field: what is it for?

The Threshold Dampening Field is a temporary barrier erected during the containment stage of dampening, and the first stage of Contextual Dampening. Its function is to isolate the subject's floor — or, in the case of a s…

Threshold Dampening Field
Third Concordance: what does it set out?

The Third Concordance is the foundational regulatory document governing the Librarianate's procedures for the classification, verification, and archival of non-existent subjects. Ratified in Year 12 of the Second Librari…

Third Concordance

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.