The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Architectural Sigils (Annex 4.3)

MS 4094.14 · Documents and ordinances

Definition and Scope

Architectural Sigils (Annex 4.3) is the working schedule of threshold sigils enumerated in Annex 4.3 to the Annex of Architectural Intent. The schedule is not itself a category of sigil; it is a catalogue of isolations, in which each architectural sigil proper is distinguished from neighbouring classes — chiefly Tactile Sigils, Pressure-Gradient Sigils, and the wider body of Operational Sigils — by the office empowered to certify it and the floor-record on which its installation is entered. Annex 4.3 currently lists eleven species of threshold sigil, together with four disputed entries held under seal since the recension of 14 Ell. 412.

The schedule was first struck to answer a question of liability rather than of architecture: when a threshold warning fails, the Tower must know whether the fault lies with the custodian who read the mark, the stone that carried it, or the office that certified it. Annex 4.3 was written to settle the third question. It is generally thought not to have done so.

The Eleven Species

Species are entered in Annex 4.3 by number, I–XI, in order of the year of first certification rather than of architectural precedence. Species I, III, IV and VIII govern the marking of doors, stairheads, cornices and stair-wells respectively. Species V deals with the marks set at the junction of two corridors of differing width, and is the only species of the eleven whose wording has never been amended. Species IX governs lantern-shelves, X the inner face of shutters, and XI the undersides of load holds. The remaining species are confined to vestibules designated under Article 2 of the Annex of Architectural Intent, and take no account of thresholds that are load-bearing.

Certification of any species proceeds under the procedure laid down for Certification of Integrated Sigils; the Annex of Architectural Intent, at Article 2, defines the Architectural Coherence a certified mark is presumed to confer — the condition in which intention, inscription, and stone agree. Where the three fail to agree, Annex 4.3 provides that the mark be re-cut, never re-lett. Species VII requires the reverse of the usual cutter.

The Recension of 14 Ell. 412

The disputed entries date from the winter of 14 Ell. 412, when the surveyor Iven Marrow-Holt submitted four threshold marks recovered from the north landing above the Penrose Stairwell Annex. All four had been cut without certification, by a custodian whose name the record renders only as the Sixth Warden of the North Landing. Marrow-Holt argued that because the marks had failed — every one of them warning a custodian of a condition not present — they belonged in Annex 4.3 as a cautionary species. The Office of Heraldic Verification objected on the ground that the schedule is an instrument of certification, not of negligence.

"The schedule shall be read to describe what has been rightly cut, and not what has been cut anyway."

— Office of Heraldic Verification, Enclosure 9 to the ruling of 3 Perv. 413

The four entries remain in the schedule, bracketed and unnumbered, beneath a heading reading "Unsanctioned; retained for reference." They are footnoted to Unsanctioned Sigils. It is a matter of some sensitivity that Species VI, added in 419 to govern the marking of buttress-base thresholds, was drafted from the third of Marrow-Holt's marks after the bracket was found to have been applied in error.

Relation to the Pressure-Gradient Classes

Annex 4.3 expressly excludes thresholds whose governing condition is atmospheric rather than architectural. Marks of that character fall under Ordinance 4, Annex C (the standardisation of Pressure-Gradient Sigils) and are entered in the pressure register, not in Annex 4.3. The exclusion is clean in principle and has been litigated at ports for forty years: the Fourth Survey Division holds that a draught across a threshold is a property of the threshold and so within Annex 4.3, while the pressure clerks hold that any moving air is weather and so beyond it.

The Department of Architectural Symbiosis, which jointly administers Annex XI with the pressure register, has proposed a border schedule reconciling the two. The proposal has been in draft since 461 and is presently in its ninth recension. No threshold has yet been certified under it.

Relation to Heraldic and Buttress Sigils

Annex 4.3 does not treat of Heraldic Sigils, of which the twenty-seven primary Sigils of the Obsidian Guard are the most prominent example; nor of Buttress Sigils, which, though they share with the threshold classes an interest in structural integrity, are governed by the buttress-juncture register and certified by the surveying office. Where a single mark serves both a heraldic and a threshold function — a gate whose guard-mark also warns of a step beyond — the mark must be certified twice, by different offices, and the two certificates are filed in separate volumes that have never been reconciled. The Office of Heraldic Verification maintains that the later certificate prevails; the surveillance office maintains the first. No case has arisen in which the difference mattered, and clerks on both sides describe the point as one best left.

Disagreement Among the Concordances

The chief scholarly dispute concerns whether Annex 4.3 binds at all. The Fifth Concordance treats the Annex of Architectural Intent as a certification instrument of general application, from which it follows that no threshold may be marked save under a species of 4.3. The Ninth Concordance, at Annex 2, states the contrary plainly:

"A mark that warns truly is a lawful mark, whether or not a schedule has room for it."

— Ninth Concordance, Annex 2, clause 6

The Standing Committee on Inscription Practice has declined three times to resolve the conflict, on the ground that the schedules are "read in the order in which they are required." In practice the reading follows the custodian's rank: sub-wardens follow the Fifth, and wardens follow the Ninth.

A minor but persistent error is the conflation of Annex 4.3 with the schedule of the same number appended to the Sigils of the Obsidian Guard. The two share a number, a year of recension, and, in three instances, identical wording. The confusion is corrected by reference to the seals: the Annex 4.3 seal is impressed in red wax, the Guard's in black. Copies bearing seals of mixed colour are to be returned to the scriptorium, where they will be reissued or, if beyond reissue, read aloud and destroyed.

See also

Referenced by

Readers also asked

Fifth Concordance: what does it set out?

The Fifth Concordance is the first major procedural concordance to survive in its entirety, ratified in Year 47 of the Second Librarianate. It is primarily concerned with establishing protocols for the measurement, docum…

Fifth Concordance
Annex of Architectural Intent: what does it set out?

The Annex of Architectural Intent is a foundational supplementary document attached to the Third Concordance that formally codifies the legal and philosophical criteria for determining the presence, primacy, and vesting …

Annex of Architectural Intent
Unsanctioned Sigils: how is it conducted?

Unsanctioned Sigils are sigils applied, inscribed, or permitted to persist without a validating entry in the Register of Authorized Marks, and are catalogued throughout the Tower as a class of Conditional Sigil known chi…

Unsanctioned Sigils
Certification of Integrated Sigils: how is it conducted?

Certification of Integrated Sigils is the administrative procedure by which a composite sigil — one assembled from two or more certified components — is itself declared certifiable as a single instrument. The procedure i…

Certification of Integrated Sigils

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.